Mind maps for requirement management

About Mind maps for requirement management

Managing requiremens is needed to make sure requirements receive the right level of attention in a design process. By providing attention to requirements, the end-result is properly based on the input given, while stakeholders are well informed throughout the process. However, maintaining requirements in a long list often results in a lack of overview, and information overload. We therefore advise to manage requirements in a mind map.

Managing requirements works best in a mind map, because:

  • It provides structure and overview
  • It allows discussing at requirements at a high-level of abstraction, as well as diving into the details
  • It increases traceability of requirements; who is the source of this requirement?

Download the full poster here: XLS exit (poster)

Details

Copyright: GriDD
When to use: managing requirements, both on a high level and a detailed level

Eager to Cut the Bullsh*t?